Showing posts with label virtual library. Show all posts
Showing posts with label virtual library. Show all posts

Tuesday, December 22, 2009

Portfolio: Pfizer, Inc -CDU Virtual Library

We weren’t expecting that Pfizer Inc they would also be commissioning us also for another virtual library. Pfizer-CDU Virtual Library was also to be transferred to another location.

In keeping with the "going green" in mind and minimize costs our clients have also requested that we should recycle some of the materials from the previous installation, especially the built up stainless steel signages, the chairs,  glass and aluminum frames.




The lounge area was located near the entrance hall. The reading area is located in the rear part of the room to isolate from the public area of the library.


This was completed middle of 2009.

Portfolio: Pfizer-CIM Virtual Library

Once you've gotten a handful of client projects under your belt, you manage to forget just how difficult that first one really was!

Corporate accounts come as a surprise when you have just started an architectural firm. Our Pfizer account came in a form of a design bidding. Three firms were invited to do the Design and build contract.

We presented our proposal and with minor revisions, at the end of the day, we were commissioned for the Pfizer-CIM Virtual Library contract in the year 2004, as one of our first corporate projects.


Late 2008, we got a call from Pfizer Inc, informing us that Pfizer-CIM will be getting some upgrading and renovations. We were invited to do the Design and Build contract for the library. 



This was completed in the early 2009.