Monday, May 6, 2013

Seaweed Farmhouse Renovation


Project Date: March 2013

Existing Conditions









Proposed Renovation






Full Color Presentation Model by: Project Box Inc.

Sunday, December 9, 2012

Cabinetry Renovations


Location: Cebu City
Completion: May 2012


Cabinetry renovations for a master's bathroom, girl's and boy's bathroom and Altar completed  early this year.

Altar
Before pic of Altar area
New Altar located at the Family area



 Girl's bathroom cabinet
Before pic of existing cabinet
New suspended drawers


Boy's bathroom cabinet

Before pic of cabinet
New drawers
New bathroom cabinet


Masters' bathroom Walk in Closet
Existing WalkIn Closet
New Walk in Closet

Saturday, July 7, 2012

Before & After: Walk-in Closet

Design and Build: Erazo Inciong Designs, Co
Location: Mandaue City Cebu
Client:Private
Completion:June 2012 

 It has been a not-so-long journey since we have started this makeover since the 3rd week of May. This journey started  as a design concept to transform an existing dark bedroom and create an open type walk-in closet which can also function as a family room and a light and airy bedroom. 

Before pics: after dismantling outdated cabinets
Before pics: after dismantling outdated cabinets
Before: The room felt small because of dark colored walls

 We wanted a "clean", contemporary and unobstructed feel of the wardrobe cabinets while still maintaining a timeless feel, so we opted for a white lacquer cabinetry with apple green and silver accents.


New Lacquer White Cabinets with Sliding Glass doors

Wall-hung drawers to keep everything in place

Wall hung headboard which function as a side table

TV Area cabinet
TubeChair--accent chair at the TV Area.

 In the cabinets, everything has its place, socks, watches, formal gowns. It was also imperative that we use the full height of the the ceiling to maximize space and reachable space. 




Saturday, June 9, 2012

Portfolio:Oslob House 2(Site Structures)

Location: Oslob, Cebu
Client: Private
Completion:2012



Completed just recently, the site structures were designed and built for easier accessibility to the main building(OslobHouse). The Site Structures-- composed of the Parking Deck, Suspended Walkway and the Elevator going to the main building--also included the perimeter fence and gate of the whole site.


Main Structure showing Elevator Shaft, Suspended Walkway and Parking Deck

Foreshore perimeter fence
Suspended Walkway and Elevator Shaft



Parking Deck

Driveway showing the Main Gate
Elevator Shaft



Service Stairs
Elevator