Saturday, December 18, 2010

Portfolio: Family Residence @ Lilo-an, Cebu



The starting point of this architectural project was to realize the need for a mid-sized house for a small family with extended families (which is normal for a close-knit Filipino family). The client was looking for a family shelter, and urban exhaust, plus the availability of a small budget and limited construction resources specific to a relatively isolated location. The program is organized according to the dominant orientation of the lot. 

This family home is intended to maximize natural lighting. Formed with a slanting roof that creates a sculptural piece, this is a curious house to be located in a Mediterranean-inspired subdivision.  This interacts with surrounding landscape in charming way. Every side and corner of the home has its own outdoors lounge and garden landscape unique combination of modern home living. 

For Implementation.

Monday, November 1, 2010

Portfolio: Farmhouse





Nestled in a farmland overlooking the mountain baragays of Cebu City. After tearing down the existing chapel on the farm due to rotten main structure, a farmhouse was developed and built to to serve as a family resthouse.
 
This family home is approximately 325 square meters.  It is mainly made of concrete, stones and wood from the small mahogany plantation of the farm. 
           
 The interior space is designed to open up towards the sea/mountain view towards the east.
View from the Ground Floor Terrace




View from the Second Floor Deck



Completed 2010.

Friday, August 6, 2010

Portfolio: Shepherds Voice

It has been a while since we have last posted on on-going projects.  It has been a very busy couple of weeks for the completion of a religious novelty shop located a SM City Cebu.   

At last! works has been completed for Shepherds Voice and the client will be moving in novelty items and other products for their opening this month.


Cabinetry were prefabricated ahead and was already done and ready to move in as early as 2009 but the schedule to mobilize construction was started only in the middle of May 2010.


Thanks to Project Box Inc for the fabrication of Shepherds Voice Logo. 










Finally completed on August 2010

Monday, July 19, 2010

Portfolio: Fine Impressions Showroom

During our stint as Design Consultant for a furniture manufacturing company based in Mandaue City, Cebu, we had a chance of designing their showroom located at A.S. Fortuna St., Mandaue City.

  

The client wanted a lounging showroom where their sales executives can bring their customers and client for casual meetings and product presentations.  Considering a very, very minimal budget for the showroom, we suggested minor construction works, and make the furniture display be the point of interest.

Completed in 2008.

Thursday, May 13, 2010

Portfolio: Cebu Institute of Medicine Amphitheater 3

The administration of Cebu Institute of Medicine commissioned us to design the proposed renovation of Amphitheater 3 located at their Main Building.  

The main purpose of the renovation was to provide better theater facilities, expand seating capacity and modernize the atmosphere of the theater.
 
The walls are fabric upholstered to achieve better sound absorption.  The ceiling is semi curved for aesthetic and acoustic purposes.





Completed in the year 2005

Portfolio: National Shrine of St. Joseph Rectory, Baptistry and Social Hall

We were commissioned to do the Design and Masterplan of the Rectory, Baptistry and Social Hall of the National Shrine of St Joseph in located Mandaue City, Cebu late 2004.




The  rectory will accommodate all priests and all other administrative activities of the church. The Baptistry and Social Hall is provided to accommodate activities for the Mandaue residents.
 
 Architectural Scale Model of the Project-Rectory

 Architectural Scale Model of the Project-Social hall
www.projectboxinc.com 


Today, the administration of the National Shrine of St Joseph has partially completed the Rectory.

We have moved!

Our new office contact details:

Erazo + Inciong Designs, Co.
Unit 3A Third Floor M&J Ortiz Bldg.,
V. Rama Ave., Guadalupe Cebu City

Tel No: (6332)2556260

Saturday, May 8, 2010

Portfolio: Pre-school Building

A design collaboration by Erazo + Inciong Designs, Co and Ritchie F Roncesvalles.
  
The program goal for the client was to create at least 4 classrooms for pre-school aged children within a very restrictive budget.  We begun design with alternatives considering cost differences and unique needs of the school.  This is an expression of the innovation and creativity and vision of our client's unique needs and vision.

Wednesday, May 5, 2010

Portfolio:Cebu Institute of Medicine Skills Laboratory

One of a few projects that we are thankful for is coming across such a project with special requirements such as a Clinical Skills Laboratory. A skills laboratory is a dedicated instructional room with dozens of interactive models and simulators for training and self study.


The Skills laboratory is located at 3rd Floor CIM, F. Ramos st. Cebu City.
(Completed 2007)

Thursday, February 18, 2010

Thursday, February 4, 2010

Portfolio: A Talisay City Residence


Sometimes, we equate bigger spaces with comfort. The grand multi-storey residence located in Talisay City Cebu happens to be all the big spaces you can get. The challenge was to turn a very large space into a warm, inviting home rich with personal style

A residence is one of the most personal and expensive endeavors one may likely to complete in one's lifetime. Our client meant it to maximize the whole area of his lot in livable space.





 The ground floor level is an open-type plan.  An informal setting was opted to make it more welcoming to guests.
 
Entertainment Suite
 

Masters Suite

 

This was completed Year 2006.